Skip to content
Menu
Civil Engineering Lectures
  • Construction Law
    • Mediation – in Construction Contracts
    • Arbitration in Construction contracts
    • Law of Contracts – Basic Legal Issues
    • DISPUTES IN CONSTRUCTION CONTRACTS
    • Law of Delict – Case Study
    • Law of Tort – An Introduction
    • Tort Law – Historical Development
    • DOCTRINE OF COMPETENCE – COMPETENCE
    • Tort Law – The parties & Vicarious Liability
    • Legal Systems in Ancient Sri Lanka
    • SECURITY OF PAYMENTS in Sri Lankan Construction Industry
    • SKILLS OF NEGOTIATIONS
    • SALE OF GOODS – IMPLIED CONDITIONS – Sri Lanka
    • Dispute resolution in Construction Projects
    • Duties, Powers, and Responsibilities of the Engineer
    • Case Law – Is it a Variation or Not?
    • Case Law – Power needed to issue variations
    • Case Law – Omissions
    • Case Law – if the Contract Administrator is not acting impartially
    • Law of contract – The Necessity of the Law
    • Law of Contract – the basics
    • Law of Contract – Unilateral and bilateral contracts
  • QUANTITY SURVEYING
    • MINIMIZING DISPUTES ARISING FROM BILL OF QUANTITIES
    • Writing Descriptions of work items in the Bill of Quantity
    • Bid Evaluation – Domestic Preference
    • Decision to tender in construction contract
    • Pre-Qualification – for Construction Contracts
    • The implication of the public procurement system to the economic growth and development of a country
    • VALUE FOR MONEY IN PROCUREMENT
    • Conditions of Contract – in Works Contracts
    • Service Contracts
    • BIDDING DOCUMENT for Works contracts
    • The Building Team
    • Methods of Tendering
    • Termination of a Construction Contract
    • Construction Claims
    • Liquidated Damages
    • BILL OF QUANTITY & THE QUANTITY SURVEYOR
    • PRELIMINARIES
    • Quantity surveyor
    • Bidding Strategy
    • Unit Rate in a Bill of Quantity
    • Price Fluctuations
    • Nominated Subcontractors
    • Building Engineering – Forces exerted on and by Buildings
    • Labor productivity – Unit rate analysis
    • Estimating Activity cost
    • Bid Price and Unbalanced Bids
    • Depreciation
    • Unit Rate Calculations – Examples – Rubble Masonry work
    • Unit rate calculation – Examples – Concrete
    • Unit rate calculation – Example – Wall painting
    • Daywork
    • Variations
    • Interim Payment Certificates
    • Contract Administration
    • ESTIMATING THE OWNING AND OPERATING COSTS OF CONSTRUCTION EQUIPMENT
  • Civil Engineering
    • MODIFICATIONS IN BUILDINGS – UNDERPINNING
    • Dewatering in Excavation
    • EXCAVATION in BUILDING CONSTRUCTION
    • The Essential Software for Civil Engineers in 2024
    • Best Software for Civil Engineering
    • PROFESSIONAL INDEMNITY INSURANCE
    • CONSTRUCTION RISKS AND INSURANCE
    • Construction machinery/equipment – Renting vs. Purchasing equipment
    • Building Engineering – An Introduction
    • ELECTRICITY – IS IT A SOURCE OF ACCIDENTS AT CONSTRUCTION SITES?
    • The Radius of Gyration (r)
    • The nature of forces acting on buildings
    • Doubly Reinforced Beams – BS 8110:1:1997 – Example 1
    • Singly Reinforced Beams – BS 8110:1:1997 – Example 1
    • Techniques used to control groundwater
    • Glass – as construction material
    • LIME – as a construction material
    • Quality of mixing water for Concrete
    • BAILEY BRIDGE CONSTRUCTIONS
    • Waste Water Disposal
    • PROCESSES USED IN WASTEWATER TREATMENTS
    • PRELIMINARY TREATMENT OF RAW WASTEWATER
    • PRELIMINARY TREATMENT OF RAW WASTEWATER
    • CONSTRUCTION MACHINERY
    • PRIMARY SEDIMENTATION TANKS
    • Biological (Secondary) Treatment Systems
    • INHERENT WEAKNESSES OF THE BUILDING INDUSTRY
    • Latent Defects and Patent Defects in Construction
    • SEGREGATION OF CONCRETE
    • CALICUT TILE ROOFING – ADVANTAGES AND DISADVANTAGES
    • Energy-Efficient Building Construction
    • DAMPNESS IN BUILDINGS
    • Septic Tank and Soakage Pit
    • Non-Load Bearing Partition Walls
    • The Versatility of Concrete
    • QUALITY MANAGEMENT IN CONSTRUCTION
    • CRYSTAL STRUCTURE OF METALS
    • SITE PRELIMINARY WORKS
    • Law of Contract – Remedies for Breach of Contract
    • INSULATION MATERIALS
    • Rubber Water stops
    • Corrosion of Reinforcing Steel: A Critical Insight
    • Bleeding Water in Concrete: Understanding and Managing Bleed Water
    • Effects of Bleeding Water on the Quality of Concrete
    • Soil Stabilization in Road Construction
    • Soil Compaction: Optimizing Soil Density for Construction
  • About us
Civil Engineering Lectures
architecture, skyscraper, urban

Nominated Subcontractors

Posted on July 6, 2020January 15, 2021

Sometimes, the client of a project wishes to have a particular subcontractor engaged in some work items because of his knowledge of that subcontractor’s skills, of his knowledge of some process, materials or plant particularly required by the client, of the specialized work that is beyond the skills of a general contractor, of need for applying of latest or new technology, or the client has a preference for using a particular subcontractor.

(There must be sound and viable reasons for this preference).

Accordingly, by engaging a nominated subcontractor, the client gets the assurance that the right party does the specialized works.

Difference between the nominated and domestic subcontractor

Difference between nominated subcontractor and domestic subcontractor

In Sri Lanka, according to the ICTAD / SBD / 01, sub-clause 63.4 (a) & (b), Nominated subcontractor means a subcontractor who is stated in the contract as a nominated subcontractor or whom the consultant instructs the contractor under Clause 39 – Variations, to employ as a subcontractor.

Usually, the client or consultant selects the nominated subcontractor through a separate bidding or procurement process. This process involves calling bids from companies that specialize in a particular field.

After selection, the client handover the sub-contractor to the main contractor. Nominated Subcontractor is the subcontractor selected in this way.

Then the main contractor enters into a subcontract with a nominated subcontractor, as with any other subcontractor, subject to certain rights of objection. The main contractor may object to the nomination for good and sufficient reasons – Sub-clause 63.5 – ICTAD / SBD / 1. (e.g. lack of experience or financial strength of the nominated sub-contractor).

Engagement against the wishes of the main contractor will probably disturb harmony on the site. Once the nominated subcontractor has been accepted by the main contractor, the main contractor is responsible for the work of the nominated subcontractor to the same extent as applies to the work.

Contractual Responsibilities

The main contractor accepts all contractual responsibility for the performance of the nominated subcontractor. Once appointed, the nominated subcontractor’s relationship with the contractor is
defined in a subcontract agreement drawn up and signed by the main contractor and the subcontractor. The important element in the arrangement is that the client wishes the contractor to be responsible for the administration and coordination of the subcontract and pays the contractor for such services.

This is not the case where the client enters into a separate direct contract for such work. In those circumstances, the consultant provides the administration and coordination on behalf of the client.

Examples of works that are likely to award to a nominated subcontractor include the supply and installation of lifts for high rise buildings, supply and installation of fire fighting equipment, etc.
The contractor shall pay to the nominated sub-contractor the amounts which the consultant certifies to be due according to the subcontract – Sub-clause 63.6 of ICTAD / SBD / 1.

Attendance

The main contractor is entitled to get a payment of a pre-determined percentage of the nominated sub contractor’s bill as attendance fee and profit – as stated in the bill of quantity – Sub-clause 63.7 – ICTAD / SBD / 1.

There are two types of attendance fees – general attendance and special attendance.

The general attendances are the already available facilities at the work site for use by the subcontractor. Examples are standard scaffolding, temporary lighting, temporary water supplies, sanitary accommodations, and welfare facilities.

Special attendance are the things specific to the particular subcontractor if requests to be provided by the main contractor. For instance, special scaffolding and special storage facilities come under this category.

Prime cost sum (PC sum) and Provisional sum

In Standard Method of Measurements in Sri Lanka – SLS 573:1999 states prime cost as a sum provided for work or services to carry out by a nominated subcontractor. It further states that such sum shall be exclusive of any profit of the main contractor. And those mention separately.

Further, it says that general attendance and special attendance to give as items following each prime cost sum. However, for special attendance, the client shall give all the necessary particulars.

Also, according to SLS 573:1999, a provisional sum in the bill of quantities shows the amount of money needed for any work to carry out by nominated subcontractors. However, there should be a provision for the inclusion of attendance fees and profit after each provisional sum.

Example:

BOQ items showing the main contractors request for profit and attendance at the bidding stage;

BOQ items showing the main contractors request for profit and attendance at the bidding stage;

The following example shows the sub-contractor’s interim bill and values added by the main contractor for his profit and attendance.

NOMINATED SUB CONTRACTORS MONTHLY BILL

2 thoughts on “Nominated Subcontractors”

  1. Manako Addo says:
    March 22, 2023 at 7:25 am

    please can you explain how to solve for the contractor’s profit and contractor’s
    attendance ?

    Reply
  2. nondumise shandu says:
    May 20, 2023 at 5:40 pm

    can you explain the co-ordination of subcontractors on site?

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Recent Posts

  • The Contract Administrator: Comprehensive Guide to the Role in Construction
  • Sustainability: Building a Better Future in Construction
  • ATTERBERG LIMITS
  • FIELD COMPACTION TESTS
  • Soil Compaction: Optimizing Soil Density for Construction

Recent Comments

  • Sembukuttige R De Silva on Soil Compaction: Optimizing Soil Density for Construction
  • Sembukuttige R De Silva on ATTERBERG LIMITS
  • Sembukuttige Rukmanthi De Silva on Sustainability: Building a Better Future in Construction
  • Sembukuttige Rukmanthi De Silva on Bid Evaluation – Domestic Preference
  • Sembukuttige Rukmanthi De Silva on Duties, Powers, and Responsibilities of the Engineer

Categories

  • Civil Engineering
  • Construction Law
  • QUANTITY SURVEYING

Legal pages

  • About us
  • Contact
  • Free e-books
  • Privacy policy
  • Terms & Conditions

Lecture Categories

  • Civil Engineering
  • Construction Law
  • QUANTITY SURVEYING
©2025 Civil Engineering Lectures | Powered by SuperbThemes