Skip to content
Menu
Civil Engineering Lectures
  • Construction Law
    • Mediation – in Construction Contracts
    • Arbitration in Construction contracts
    • Law of Contracts – Basic Legal Issues
    • DISPUTES IN CONSTRUCTION CONTRACTS
    • Law of Delict – Case Study
    • Law of Tort – An Introduction
    • Tort Law – Historical Development
    • DOCTRINE OF COMPETENCE – COMPETENCE
    • Tort Law – The parties & Vicarious Liability
    • Legal Systems in Ancient Sri Lanka
    • SECURITY OF PAYMENTS in Sri Lankan Construction Industry
    • SKILLS OF NEGOTIATIONS
    • SALE OF GOODS – IMPLIED CONDITIONS – Sri Lanka
    • Dispute resolution in Construction Projects
    • Duties, Powers, and Responsibilities of the Engineer
    • Case Law – Is it a Variation or Not?
    • Case Law – Power needed to issue variations
    • Case Law – Omissions
    • Case Law – if the Contract Administrator is not acting impartially
    • Law of contract – The Necessity of the Law
    • Law of Contract – the basics
    • Law of Contract – Unilateral and bilateral contracts
  • QUANTITY SURVEYING
    • MINIMIZING DISPUTES ARISING FROM BILL OF QUANTITIES
    • Writing Descriptions of work items in the Bill of Quantity
    • Bid Evaluation – Domestic Preference
    • Decision to tender in construction contract
    • Pre-Qualification – for Construction Contracts
    • The implication of the public procurement system to the economic growth and development of a country
    • VALUE FOR MONEY IN PROCUREMENT
    • Conditions of Contract – in Works Contracts
    • Service Contracts
    • BIDDING DOCUMENT for Works contracts
    • The Building Team
    • Methods of Tendering
    • Termination of a Construction Contract
    • Construction Claims
    • Liquidated Damages
    • BILL OF QUANTITY & THE QUANTITY SURVEYOR
    • PRELIMINARIES
    • Quantity surveyor
    • Bidding Strategy
    • Unit Rate in a Bill of Quantity
    • Price Fluctuations
    • Nominated Subcontractors
    • Building Engineering – Forces exerted on and by Buildings
    • Labor productivity – Unit rate analysis
    • Estimating Activity cost
    • Bid Price and Unbalanced Bids
    • Depreciation
    • Unit Rate Calculations – Examples – Rubble Masonry work
    • Unit rate calculation – Examples – Concrete
    • Unit rate calculation – Example – Wall painting
    • Daywork
    • Variations
    • Interim Payment Certificates
    • Contract Administration
    • ESTIMATING THE OWNING AND OPERATING COSTS OF CONSTRUCTION EQUIPMENT
  • Civil Engineering
    • MODIFICATIONS IN BUILDINGS – UNDERPINNING
    • Dewatering in Excavation
    • EXCAVATION in BUILDING CONSTRUCTION
    • The Essential Software for Civil Engineers in 2024
    • Best Software for Civil Engineering
    • PROFESSIONAL INDEMNITY INSURANCE
    • CONSTRUCTION RISKS AND INSURANCE
    • Construction machinery/equipment – Renting vs. Purchasing equipment
    • Building Engineering – An Introduction
    • ELECTRICITY – IS IT A SOURCE OF ACCIDENTS AT CONSTRUCTION SITES?
    • The Radius of Gyration (r)
    • The nature of forces acting on buildings
    • Doubly Reinforced Beams – BS 8110:1:1997 – Example 1
    • Singly Reinforced Beams – BS 8110:1:1997 – Example 1
    • Techniques used to control groundwater
    • Glass – as construction material
    • LIME – as a construction material
    • Quality of mixing water for Concrete
    • BAILEY BRIDGE CONSTRUCTIONS
    • Waste Water Disposal
    • PROCESSES USED IN WASTEWATER TREATMENTS
    • PRELIMINARY TREATMENT OF RAW WASTEWATER
    • PRELIMINARY TREATMENT OF RAW WASTEWATER
    • CONSTRUCTION MACHINERY
    • PRIMARY SEDIMENTATION TANKS
    • Biological (Secondary) Treatment Systems
    • INHERENT WEAKNESSES OF THE BUILDING INDUSTRY
    • Latent Defects and Patent Defects in Construction
    • SEGREGATION OF CONCRETE
    • CALICUT TILE ROOFING – ADVANTAGES AND DISADVANTAGES
    • Energy-Efficient Building Construction
    • DAMPNESS IN BUILDINGS
    • Septic Tank and Soakage Pit
    • Non-Load Bearing Partition Walls
    • The Versatility of Concrete
    • QUALITY MANAGEMENT IN CONSTRUCTION
    • CRYSTAL STRUCTURE OF METALS
    • SITE PRELIMINARY WORKS
    • Law of Contract – Remedies for Breach of Contract
    • INSULATION MATERIALS
    • Rubber Water stops
    • Corrosion of Reinforcing Steel: A Critical Insight
    • Bleeding Water in Concrete: Understanding and Managing Bleed Water
    • Effects of Bleeding Water on the Quality of Concrete
    • Soil Stabilization in Road Construction
    • Soil Compaction: Optimizing Soil Density for Construction
  • About us
Civil Engineering Lectures
ATTERBERG LIMITS

ATTERBERG LIMITS

Posted on August 6, 2024August 6, 2024

Water content plays an important role in the behavior of clayey soil.

When the water content changes, clay surprisingly changes its characteristics. When subjected to a large amount of water, it is similar to a lean soup, which we call the liquid phase. At a little drier state, it becomes similar to soft butter, called the plastic phase. At a further dried stage, it behaves like a cheese or semi-solid, and at a very dry stage, it is like a hard candy, a solid phase.

The Liquid limit,LL, is defined as the water content between the liquid phase and the plastic phase.

The Plastic limit, PL, is defined as the boundary water content between plastic and semisolid phases.

Shrinkage limit, SL, is defined as the maximum water content below which no further volume change of the clay will occur.

These situations are demonstrated in the above figure.

At the shrinkage limit, the soil is still fully saturated.

LL and SL can be understood from the learning of the clay–water system. The adsorbed water layer is considered an integral part of clay particles.

After encountering water, due to the action of the electrostatic field force, the positive ions and polar water molecules in the water will be adsorbed around the particles and aligned to form a water film. This part of water is called adsorbed water.

As shown in Figure above, when clay particles contain enough water, adsorbed water layers are not at all in contact with each other. Therefore, there is no frictional resistance. It is at a liquid stage as shown in above Figure a.

Now, when water is taken away to a certain level at which all the adsorbed water layers are just in contact, frictional resistance will be built up at the points of contact. This is considered to be the stage of LL as shown in Figure b. When it is further dried, overlapping of the adsorbed water layer will take place.

The limiting stage of this overlapping is the level at which all particles themselves touch each other and no further overlapping will be possible, as shown in Figure c. This stage is regarded as the SL.

PL may have some degree of overlapping of adsorbed water layers.

Those three limits are called the Atterberg limits. It is named after a Swedish scientist, A. Atterberg, who defined those limits in the early 1900s.

The present standard liquid limit test (ASTM D-4318) uses a small semispherical cup as shown in the figure below.

A thoroughly mixed wet clay specimen is filled into a portion of the cup, and a groove is cut with a special grooving tool on the center portion of the specimen. The cranking handle is fitted to a cam that lifts and drops the cup when rotated. The handle is then rotated at the speed of two revolutions per second until the opening of the groove in the clay sample closes with a 13 mm length.

The number of revolutions or blow counts is documented. The water content at this stage is calculated.

Several trials are conducted with different specimens, with slightly different water contents. Usually, these water contents differ only by a few percentages.

A Flow curve, which plots the blow counts and the corresponding measured water contents in a semi-log scale, is prepared, as shown in the Figure.

LL is then termed as the water content with 25 blows in the flow curve.

PL test is run in a more basic way (ASTM D-4318).

A drier specimen is rolled into a thread by human palms on a glass plate. PL is defined as the water content at which a rolled thread just crumbles with a 3 mm diameter, as shown in the figure below.

Several trials shall be made to take the average water content at that stage to get the PL value.

The SL test is done by measuring the water content wi and the volume Vi of a saturated specimen, slightly above its LL, and the oven-dried volume Vf and weight Wf of the same specimen.

Since the volume change due to shrinkage from Vi to Vf is simply due to loss of water from wi to SL, weight loss of specimen (Vi − Vf) x γw is equal to (wi − SL) x (100) x Wf , and thus:

From these limits, various important parameters are developed.

The plasticity index (PI) is defined as PI = LL − PL

It indicates the range of water content of a material for its plastic behavior, and many engineering behaviors of clays are related to PI.

Another parameter called the liquidity index (LI) is defined as;

        where wn is the natural water content of the soil.

The liquidity index shows the position of the current water content above the PL relative to PI. In most in situ soils, LI ranges from 0% (wn at PL) to 100% (wn at LL).

1 thought on “ATTERBERG LIMITS”

  1. Sembukuttige R De Silva says:
    April 15, 2025 at 8:39 am

    What Building Materials are we running short during unusual weather patterns and odd geology changes within Asia Basin ?
    Many thanks for the Quick Revision Formula and Notes above.
    Best wishes for Technicians working in Lower Ground tunnels and Mezzanine Levels.
    Noted Construction Activity and replacement components going on below my First Floor Level Apartment in Colombo Narahenpita Manning Town Complex, Premises Plan – behind the Narahenpita railway road.
    Many Happy Rewards for completing most of the dirty, dusty, dark work tasks in the past three weeks. Wish you all and Team Leaders a Healthy Environment with Better work conditions soon! Annual General Meeting to be held via Project Co-ordinates on Sunday, 27 April 2025 at 3:00pm within Premises. RSVP

    Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Recent Posts

  • The Contract Administrator: Comprehensive Guide to the Role in Construction
  • Sustainability: Building a Better Future in Construction
  • ATTERBERG LIMITS
  • FIELD COMPACTION TESTS
  • Soil Compaction: Optimizing Soil Density for Construction

Recent Comments

  • Sembukuttige R De Silva on Soil Compaction: Optimizing Soil Density for Construction
  • Sembukuttige R De Silva on ATTERBERG LIMITS
  • Sembukuttige Rukmanthi De Silva on Sustainability: Building a Better Future in Construction
  • Sembukuttige Rukmanthi De Silva on Bid Evaluation – Domestic Preference
  • Sembukuttige Rukmanthi De Silva on Duties, Powers, and Responsibilities of the Engineer

Categories

  • Civil Engineering
  • Construction Law
  • QUANTITY SURVEYING

Legal pages

  • About us
  • Contact
  • Free e-books
  • Privacy policy
  • Terms & Conditions

Lecture Categories

  • Civil Engineering
  • Construction Law
  • QUANTITY SURVEYING
©2025 Civil Engineering Lectures | Powered by SuperbThemes